
Ribbon Cutting at the Clēnera Wapello Solar Project
The 127 MW Clēnera Wapello Solar Project in Iowa was commissioned in March of 2021. It features the FTC Solar Voyager tracker with bifacial panels:
The 127 MW Clēnera Wapello Solar Project in Iowa was commissioned in March of 2021. It features the FTC Solar Voyager tracker with bifacial panels:
Solar technology companies will play an essential role in helping the solar industry to scale over the next few years. That’s because technology is the key driver of solar growth, according to FTC Solar Chief Technology Officer Nagendra Cherukipalli.
This year Solar Power International will having a virtual event due to the COVID pandemic. The show will include solar, wind, batteries, electric vehicles, and other cutting edge renewable energy technologies. Come join us Oct 21-22 at the virtual trade show!
Join us at the 13th Annual Greentech Media Solar Summit. This is a virtual event, October 26-29. FTC Solar Engineering Director Mitch Bowman will be speaking October 28th.
A new Wood Mackenzie report on the global market for trackers anticipates rapid growth over the next five years. Two hotspots – the Middle East and Africa.
9020 North Capital of Texas Hwy,
Building 1, Suite 260
Austin, TX 78759
FTC Solar Australia Pty Ltd
16 Duntroon Street
Brendale, QLD
Australia 4500
Email:
Email:
Email:
2023 Copyright © FTC Solar. All Rights Reserved